  • Category: Water Supply & Sanitaion
  • Client: Climate Resilient Large Water Supply Project, Department of Water Supply and Sewerage Management
  • Project Start Date: September, 2021
  • Project End Date: July, 2022
  • Scope of Services: Lamjung District

Project Description

Detail Engineering Survey and Design of Turlungkot Water Supply Project, Lamjung; Rainas Water Supply Project

Turlungkot Water Supply Project

  • Number and type of scheme: 1, Multistage Pumping
  • Benefited Population and Households: 12158 PP and 1660 HH (Design Year)
  • Total pipe length: 125.1 Km (Transmission + Distribution)
  • Design Discharge: 10 lps
  • Major structure designed: Pumping accessories, RCC Weir Intake, RCC Collector Well, Plain Sedimentation Tank (10 lps), Slow sand filter (10lp), 20cum-300cum circular RCC reservoir, office building, pumping system, etc
  • Project Cost: 458.985 million

Rainas Water Supply Project

  • Number and type of scheme: 1, Multistage Pumping
  • Benefited Population and Households: 11473 PP and 1654 HH (Design Year)
  • Total pipe length: 42.9 Km (Transmission + Distribution)
  • Design Discharge: 10 lps
  • Major structure designed: Pumping accessories, RCC Weir Intake, RCC Collector Well, Plain Sedimentation Tank (10lps), Slow sand filter (10lp), 20cum-300cum circular RCC reservoir, office building, pumping system, etc
  • Project Cost: 328.752 million

Services

  • Detailed review of existing documents, maps, policies and relevant past project reports
  • Assessment of existing water supply and sanitation in the area
  • Carryout socio-economic survey and detailed engineering survey
  • Selection of source, calculation of yield, water quality, etc.
  • Design, sizing of transmission line, distribution lines, reservoirs, treatment plants (sedimentation tank, slow sand filter, sand wash platform), chambers, office buildings, household connections etc.
  • Preparation of detailed project report, BoQ, tender documents and specifications