Loading...

Our Projects

Project information

  • Category: Road, Bridge & Transport Infrastructure
  • Client: Rural Access Programme-2; DFID-UK assistance
  • Project Start Date: February, 2009
  • Project End Date: June, 2012
  • Scope of Services: Bhojpur District

Project Description

Rural Access Programme provided access to goods and services to poor households including creation of local employment through construction of environment friendly district roads adopting labour-based methods, plus many supporting income generating activities for enhancement of livelihoods of project affected households. Besides labour-based methods, small equipment were also introduced in RAP2.

In Bhojpur, construction of Bhojpur – Dilgla (35 Km) and Bhojpur - Ghodetar (35 Km) major district roads total length 70 kilometers were taken up from RAP assistance. Project construction cost was NRs. 427 million.

Services

  • Review of the road alignment.
  • Carried out construction field survey works and alignment lay-out including verification of the cadastral survey.
  • Review the detailed design of the alignment adopting labor based participatory and environment friendly approach including preparation of site-specific structural design of longitudinal and cross drainage structures and retaining walls.
  • Preparation of detailed cost of construction contract packages for completion of road.
  • Preparation of site-specific EMP, carrying out environmental management and bio-engineering works.
  • Conduct technical training to construction supervisors, worker groups and road construction and maintenance committees.
  • Full-time construction supervision of the road including quality control.
  • Work evaluation preparation/certification of payment bills.
  • Organized approach orientation and road supervisor & RBG training.
  • Coordination with the local institutions like VDC, DDC, DRCC, UC/UG, Local NGOs, line agencies etc.
  • Preparation of Monthly Work Progress Reports, Annual Reports and Project Completion Report including As-Built Drawings.