Project information
- Category: Road, Bridge & Transport Infrastructure
- Client: Department of Road
- Project Start Date: April, 2013
- Project End Date: April, 2016
- Scope of Services: Udaypur and Saptari District
Project Description
With the increasing demand for bridges due to the expansion of road network, Department of Roads (DOR) identified a need to address bridges separately within the framework of the ‘Departmental Policy Document, the DoR strategy (July, 1995)’. In line with this Policy Document, DoR presents its vision in developing and maintaining bridges through the policy statement: Provide safe, reliable and cost effective bridges. The prime concern of the assignment was to provide safe bridges by designing bridges with standard loading, giving due concern to users’ safety and safety of bridges. The next concern was to provide confidence to users in order to run their livelihoods (social movement and business) in an environment of reliable bridges. This is achieved through appropriate design, quality in construction and maintenance, and adequate emergency measures to keep the crossing access open for general traffic even in times of emergency.
Services
The main objective of this project is to perform Feasibility Study, Detailed Engineering Survey, Hydrological Study and Detailed Design and cost estimate preparation of following 9 Bridges
| Bridge Name | Bridge Location |
|---|---|
| Setamari-Dhardhare Bridge | Udayapur |
| Hadaiya Khola Bridge | Udayapur |
| Murkatuwa Khola Bridge | Saptari |
| Debdhar Nadi Bridge | Saptari |
| Birdhana Nadi Bridge | Saptari |
| Chimti Khola Bridge | Saptari |
| Chapini Nadi Bridge | Saptari |
| Judi Nadi Bridge | Saptari |
| Kharak Nadi Bridge | Saptari |
Services provided for the project
- Desk study
- Detailed Engineering Study, Survey & Investigation
- Feasibility study
- Geological and Geomorphologic study
- Topographical Survey
- Hydrology Study
- Seismological Study
- Consideration on Environment Protection/ Environmental Safeguards
- Subsurface Exploration
- Quantity/Cost estimates
- Detailed Design